PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Patching the shear walls Stair -2-Elev. 4 (South Elevation).jpg Copper piping at the 3rd floor bathroom Facing North.jpg Installed metal furring at 2nd floor Elev. 5,6 Shear wall Facing North-East.jpg Installed sheathing around the perimeter of the low roof Facing North-West.jpg Installing copper piping at the 2nd floor bathrooms.jpg Installing copper piping at the 3rd floor bathrooms Facing West.jpg Laying out block at Break Room 131 Facing North-West.jpg Setting the door frame at the Sally port Entrance (West Elevation).jpg
Previous pageNext page Installing copper piping at the 2nd floor bathrooms
Installing copper piping at the 2nd floor bathrooms